Preparation of plastered or concrete surfaces for painting, including sand papering the…

Indicative unit rate and the full material, labour and plant build-up — per do.

Preparation of plastered or concrete surfaces for painting, including sand papering the…

per do

Indicative unit rate

₹11.15

per do

Materials

Resource Coeff. Unit Rate Amount
Sand paper No. 120 1 sqm 0.8 0.39
Raw linseed oil, IS:75 0.03 litre 110 1.59
Approved quality filler (white lead, linseed oil, varnish, chalk mitti) 0.05 kg 80 1.93

Labour

Resource Coeff. Unit Rate Amount
Painter 1st class 0.02 day 476 4.59
Beldar 0.01 day 320.83 1.55

Plant

No plant component for this item.

Where this comes from: reference rates from real, live projects. Indicative for early-stage estimating — verify before tender.

Need more than one rate?

Build a full BOQ with every item priced, or open this item in EstimateNext.

Looking for something else? Search all items →

About this rate

How is the rate for Preparation of plastered or concrete surfaces for painting, including sand papering the… calculated?
It is built up from the material, labour and plant resources shown, with reference rates from real, live projects. Figures are indicative — verify against current market rates before tender.
What is the unit of measurement?
The rate of ₹11.15 is per do. Multiply by your quantity to estimate the line total.